I just talked with Richard and hopefully the concrete pad will be poured this weekend.
We moved the dyno from its original building and into the new building. Problem now is that it is a mud hole between the two buildings when it rains and we can't track all the mud onto the dyno. The concrete pad needs to be completed between the two buildings before the dyno can be used.
you must know people that know some "people"...... I called Richard and Gene all day with no luck.
:biggrin:
whats up jim and derek- ill be down when its on
thanks john
anyone see matts ty yet???
I just talked with Richard and hopefully the concrete pad will be poured this weekend.
We moved the dyno from its original building and into the new building. Problem now is that it is a mud hole between the two buildings when it rains and we can't track all the mud onto the dyno. The concrete pad needs to be completed between the two buildings before the dyno can be used.
Pat--I can't do that. I have had a virus/cold for the last week and it is kicking my butt.
Derrick....WAZZUP?!?
you guy's wouldn't have all this fun w/o inviting me....now would ya?!?
Jim...I know how you feel...that cold/flu thing...is killin me too...I was REALLY sick last time I came down and did the brakes and "tweaked" my tranny...Hopefully my fuel pump will be here on Monday (3-12) so I'll definately be back down to get it in...
John
Picture is inside the new building.