i pulled my engine out and am rebuilding it and was wondering if i need special pistons or cam or crank my machine shop charged me 1120 for top and bottom gaskets, bore the engine 30 over, new pistons, lifters, rebuild crank, new cam, all new bearings, new timing chain (was ready to go), engine degrease, and oil pump rebuild. i had already rebuild the heads then motor went in like two weeks so those were done.
motor will be done in a couple days.
motor was knocking and crank had spun a bearing.
first car i ever rebuilt the engine in and am excited to see how a fresh engine runs.
oh yea and was wondering with a rebuilt bottom end would i be able to run a bigger turbo and would it be noticeable power increase
motor will be done in a couple days.
motor was knocking and crank had spun a bearing.
first car i ever rebuilt the engine in and am excited to see how a fresh engine runs.
oh yea and was wondering with a rebuilt bottom end would i be able to run a bigger turbo and would it be noticeable power increase