I'm doing the valve job on my own heads and need sugestions on what to do with the ports under the new valves. I've cut the seats out to the correct size for the valve and now there is a large taper under the valve. I used a 60deg stone to open the port but it looks as though there could be more done. Any sugestions would be appreciated
Ken
87 GN
Ken
87 GN