Been pacing myself on this install. Usually in 2 days it would be in and running. Now I'm just tackling a little bit at a time after work for a couple hours and calling it a night.
Day 1 - Get the car off the lift and on the floor, take the engine off the engine stand, install the motor mounts, and put the engine in the engine compartment. Walk away...
Day 2 - Tranny is finally back in the car and fully hooked up, along with the driveshaft, starter and X over pipe. Walk away...
Day 3 - All oil lines, coolant lines/hoses, vacuum lines and boost lines are installed. Put oil in the motor and filter and primed the engine. Hooked up my power steering pump, serp belt, alternator, one intercooler pipe, put in my distributor and locked in my timing. Walk away...